Roofing · Palm Beach to Fort Myers

Commercial roofing, from the same licensed crews that roof our homes.

Our roofing work covers commercial buildings as well as homes, in the same four systems: flat and low-slope, metal, tile and shingle. We inspect the building, put the scope in writing, pull the permit under our roofing license and see it through final inspection.

  • Roofing license CCC1337755
  • In-house crews, no day‑labor subs
  • Permit-passing guarantee

Tell us about the building

Takes about a minute. We text or call within one business day.

Get a Free Roofing Estimate

We use your details only to contact you about your estimate. Privacy policy

Which roof is on your building?

Pick the roof. See how we do it.

Four systems, each with its own page. Tap the one your building has, or the one you want.

Four systemsTap one

Flat and low-slope

The usual roof on a commercial building: a flat-roof system across the top.

Flat roofing

Not sure what's up there?Get a free roof estimate

Your written estimate

What a commercial roof estimate names.

Quoted in writing after an inspection of the building, never by phone.

Building
Address and the roof sections covered
Roof system
Flat, metal, tile or shingle
Manufacturer
Named on the estimate
Permit
Pulled by us under CCC1337755
Crew
Our own, in-house
Inspection
Permit-passing guarantee

From our roofing jobs

Our crews at work.

These photos are from our residential roofing jobs. The crew, the steps and the permit process are the same on a commercial building.

Dark standing-seam metal panels being installed over underlayment on a waterfront home
Metal panels going on over underlayment.
An Access Impact roofer pointing to the Polyglass underlayment on a roof deck
Underlayment checked before the roof goes on.
Our roofing crew tearing off an old shingle roof, with the work truck and dumpster in the driveway
Tear-off down to the deck.

Where it fits

What helps us quote a commercial roof.

Have ready

  • Who can approve the work: the owner, the manager or the association
  • Access to the roof for the inspection
  • Any building or association rules about work hours

Good to know

  • Every roof is quoted in writing after an inspection, not by phone
  • The permit is pulled by us and closed out at final inspection

From estimate to final inspection

Six steps, from inspection to a closed permit.

  1. Free inspection and written estimate

    We look at the roof, the deck and the flashing, then put the system, the manufacturer and the price in writing.

  2. We pull the permit

    Filed under our roofing license, CCC1337755. You don't deal with the building department.

  3. Tear-off

    Our crew strips the old roof down to the deck and hauls the debris away.

  4. Underlayment

    New underlayment goes down over the deck and gets checked before anything covers it.

  5. The new roof goes on

    Installed by the same in-house crew.

  6. Final inspection

    We meet the inspector and close out the permit. Backed by our permit-passing guarantee.

Questions

Commercial roofing questions, answered.

Something not covered here? Call (561) 283‑2777 or (239) 296‑5996.

More roofing: roof replacement, metal, tile, shingle, flat and low-slope and storm damage.

Do you do commercial roofing?

Yes. Our roofing work covers commercial buildings as well as homes, under our roofing license, CCC1337755. The crews are our own, the same ones that roof houses, and the process is the same: inspection, written estimate, permit, tear-off, new roof and final inspection, with permit passing guaranteed.

Which roof systems do you install on commercial buildings?

The same four we install on homes: flat and low-slope, standing-seam metal, concrete or clay tile, and asphalt shingle. Flat roofs are the usual roof on a commercial building. Each system has its own page, and the estimate names the system and the manufacturer for your roof.

How do you quote a commercial roof?

After an inspection of the building, in writing. We look at the roof, the deck and the flashing, then put the scope, the system, the manufacturer and the price on the estimate. Have whoever approves the work, an owner, manager or association, in the loop early, so the decision doesn't stall.

Who pulls the permit on a commercial roof?

We do. It's filed under our roofing license, CCC1337755, and we meet the inspector at the end and close out the permit. Permit passing is guaranteed, so you don't deal with the building department at any point of the job.

Which areas do you cover for commercial roofing?

Palm Beach and Broward counties from our Deerfield Beach office, (561) 283-2777, and Lee and Collier counties from our Fort Myers office, (239) 296-5996. Call the office for the building's county, or send the form and the right office gets back to you.

How much does a commercial roof cost?

We don't publish a price list. A commercial roof is priced by its size and shape, the system, the condition of the deck, and access to the roof. The inspection and the written estimate are free, so you'll have a real number for the building before anyone commits to anything.

Have a building to roof? Start with a free inspection.

Free inspection, written estimate, our own licensed crew.

Both officesMon–Fri 8:30–4:30 · Sat 9–12